News and insights

Key events of the group and the team's view of the mining industry and subsoil use in Kazakhstan.

Media enquiries: info@mcg-kaz.com

News

Key events

  • Muzbel: 1.0 Moz of gold in JORC Mineral Resources

    The independent Mineral Resource estimate for the Muzbel deposit under the JORC Code (2012) has been completed. Mineral Resources total 30.3 Mt of ore at 1.00 g/t Au: 1.0 Moz of gold and 0.65 Moz of silver. More about Muzbel

  • Entry into Berkara

    The group has entered the Berkara copper project as managing partner. The complex produces cathode copper by SX-EW with a design capacity of 5.5 ktpa.

  • Taskora plant upgrade

    New mills are being installed at the gold processing plant. Hourly processing throughput will increase by about 40%.

  • Muzbel exploration programme completed

    From 2020 to 2025, 141 diamond drill holes totalling 27,600 m were drilled at the deposit; samples were assayed at ALS and SGS.

  • Rehabilitation completed

    The company the group entered in 2018 has fully restored its business operations.

  • First investor and drilling starts at Muzbel

    The first investment partner joined the Taskora and Muzbel projects; large-scale exploration of Muzbel began.

Insights

Coming soon

To receive these articles when they are published, write to us at info@mcg-kaz.com.

Regulation

Subsoil use in Kazakhstan: what an investor needs to know

Licences and contracts, terms and obligations, transfer of rights and KazRC reporting.

Soon
Project economics

What goes into the cost of an ounce

Mining, processing, mineral extraction tax, refining: the cost structure of a small gold mine.

Soon
Markets

Copper in Central Asia

Operating mines, new projects and the place of heap leaching and SX-EW in the region.

Soon