Current projects
Gold, silver and copper in the Abai Region of Kazakhstan: two operating mines, a deposit at the pre-development stage and exploration licences.
The group is open to new projects in Kazakhstan and abroad. Criteria and forms of participation.

GoldCopper
- TaskoraAbai Region · operator Production Open-pit gold mining with its own CIP plant · mining contract extension under way
- MuzbelAbai Region · 40 km from Taskora Pre-development 1.0 Moz Au and 0.65 Moz Ag in JORC Mineral Resources · 3 Mtpa plant planned
- BerkaraAbai Region · managing partner Production 5.5 ktpa of cathode copper · two operating open pits
- ExplorationKazakhstan · licences Exploration New licence blocks and screening of projects to enter as an investor
ExplorationResourcesDevelopmentProduction
Summary
Projects in figures
| Project | Metal | Stage | Group's role | Key figure |
|---|---|---|---|---|
| Taskora | Au | Production | Operator | CIP plant, 70 ktpa of ore |
| Muzbel | Au, Ag | Pre-development | Operator | 1.0 Moz Au (JORC) |
| Berkara | Cu | Production | Managing partner | 5.5 ktpa of cathode copper |
| Exploration | Au, Cu, polymetallic | Exploration | Operator | Exploration licences |
Muzbel Mineral Resources: independent estimate under the JORC Code (2012) as at 13 May 2026. Taskora plant capacity is the figure before the 2026 upgrade. Berkara capacity is the design figure.