Berkara Mining and Metallurgical Complex

An operating copper mining and metallurgical complex near the district centre of Aktogay: open-pit ore mining and finished-product output.

~650 kt
ore production per year
1.2%
average copper grade (LOM)
5.5–6 kt
copper output per year
2023
production launch

Operating copper production

The mining and metallurgical complex at the Berkara deposit conducts open-pit mining of copper ore and produces finished products. Production was launched in 2023 and has reached its design capacity of 5.5–6 thousand tonnes of copper per year.

The process flowsheet delivers copper recovery of up to 70% from mixed ores and up to 80% from oxidised ores, with off-balance (sub-economic) material from dumps brought into processing.

The complex's resource base comprises ore in the open pit and off-balance (sub-economic) ore in dumps, providing a horizon of stable operation into the early 2030s with potential for extension.

LocationAbai Region, near the district centre of Aktogay
StatusOperating production (since 2023)
Mining~650 thousand tonnes of ore per year
Average grade (LOM)Cu 1.2%
In-pit resources2.3 million tonnes of ore (from 2026)
Off-balance (sub-economic) ore in dumps4.9 million tonnes (average grade Cu 0.34%)
Recovery70% mixed ores · 80% oxidised ores
Open-pit copper mine
Loading copper ore into a mining haul truck

Imagery: open sources (Wikimedia Commons). To be replaced with site photographs.

Other holding assets

The Taskora and Muzbel gold mining complex, the Kentau processing plant and a portfolio of exploration licences.