Kentau Processing Plant + Bayaldyr Tailings Storage Facility

Reprocessing of man-made mineral material in Turkestan Region: an approved resource base under the KazRC Code and a long-term mining licence.

131 million t
ore reserves and resources (KazRC)
409 thousand t
of lead at a grade of 0.31%
618 thousand t
of zinc at a grade of 0.47%
2047
mining licence validity period

A man-made deposit with a confirmed resource base

The Bayaldyr tailings storage facility was established in 1961 to accommodate flotation tailings from the Kentau and Mirgalimsay processing plants, which formed part of Achpolimetall JSC. Barite-polymetallic ores from the Mirgalimsay, Shalkiya, Ansay, Karagayly and Zharrem deposits were previously processed here.

In 2023–2024, a full cycle of exploration work was carried out at the site: 229 holes were drilled for a total of 6,723 linear metres with a core recovery of 86%. Laboratory testing was performed at the international laboratories SGS, ALS and SAEL using the multi-element ICP-OES method.

Reserves and resources have been estimated to a depth of 280 metres in accordance with the KazRC Code; the report has been approved by the Geology Committee of the Republic of Kazakhstan.

LocationTurkestan Region, city of Kentau
Asset typeMan-made mineral formation (tailings)
Site area346 ha
Reserves and resources (KazRC)131.2 million tonnes of ore
— Identified114.1 million t (Pb 0.31% · Zn 0.50%)
— Inferred17.0 million t (Pb 0.30% · Zn 0.27%)
Primary metalslead, zinc

Processing capacity

01

Plant No. 1 — in operation

Capacity of 100 thousand tonnes per year. Commissioned and carrying out industrial-scale processing of mineral material.

02

Plant No. 2 — under construction

Design capacity of 6 million tonnes per year. Construction and installation work is under way; the process design specification is being developed by the engineering company Xinhai.

03

Infrastructure

25 MW power transmission lines on the plant site, a road and a railway line within the city limits, finished-product and reagent warehouses, and a rotational workers' camp.

Licences and permitting documentation

Solid minerals mining licenceNo. 167-NML dated 21 May 2025, valid until 21 May 2047
Exploration licenceNo. 965-EL
Mine planapproved through 2046
Environmental impact assessment (EIA)positive conclusion issued by the Ecology Committee of the Ministry of Ecology and Natural Resources of the Republic of Kazakhstan; public hearings have been held
Industrial safety declarationregistered with the Industrial Safety Committee of the Ministry of Emergency Situations of the Republic of Kazakhstan
Social commitmentsagreement with the Kentau city administration (akimat) on social support for the region throughout the mining period
Surroundings of the city of Kentau, Turkestan Region
Processing plant

Imagery: open sources (Wikimedia Commons). To be replaced with site photographs.

Other holding assets

The Taskora and Muzbel gold mining complex, the Berkara mining and metallurgical complex, and a portfolio of exploration licences.